Friction Survey for FPF-1 Floating Production Facility Helideck


Project Outline

CAe were contracted to conduct a friction survey on the FPF-1 floating production facility offshore helideck conforming to CAA CAP437.

Project Description

The FPF-1 platform helideck survey was performed during platform commissioning whilst based in the Remontowa Shipyard in Gdansk Poland. A tight schedule had to be adhered to due to the complex nature of all other commissioning works and the logistics involving equipment transfer to Poland. A full technical report was supplied inline with the customer’s requirements including a contour map highlighting any areas of low friction. Full certification was granted to the helideck to allow operation without a landing net for 12 months.



01
01
02
02
03
03

Related News

Your login details have been used by another user or machine. Login details can only be used once at any one time so you have therefore automatically been logged out. Please contact your sites administrator if you believe this other user or machine has unauthorised access.